Section 11
INSTALLATION
2-2
This section contains instructions for checking and
repacking the unit, bench or rack mounting, connecting the
unit to ac input power, and converting the unit from one line
voltage to another if required. Instructions for connecting load
and HP-IB cables, and for setting the HP-IB address are given
in Section III.
2-3
INITIAL INSPECTION
2-4
Before shipment, this instrument was inspected and
found to be free of mechanical and electrical defects. As soon
as the instrument is unpacked, inspect for any damage that
may have occurred in transit. Save all packing materials until
the inspection is completed. If damage is found, file claim with
carrier immediately. The Hewlett-Packard Sales and Service
office should be notified as soon as possible.
2-6
This check should confirm that there are no broken
knobs or connectors, that the cabinet and panel surfaces are
free of dents and scratches, and that the meter face and rear-
panel terminal block cover are not scratched or cracked.
2-7
Electrical Check
2-8
Section V contains complete verification procedures
for this instrument. Section HI contains an abbreviated check
which can be used quickly to place the unit into operation.
Refer to the inside front cover of the manual for Certification
and Warranty statements.
2-9
PREPARATION FOR USE
2-10
In order to be put into service, the 6034A must be