Power Supply Box Components; Temperature Controller - Vulcan-Hart VG30 Service Manual

Gas braising pans (30 & 40 gallon)
Table of Contents

Advertisement

GAS BRAISING PANS - REMOVAL AND REPLACEMENT OF PARTS
8.
Pull temperature dial from potentiometer shaft
and remove mounting nut.
9.
Control panel is removed.
10. To install.
A.
Align tab on potentiometer with positioning
bracket on panel.
B.
Install mounting nut and tighten.
C.
Adjust stop nut on potentiometer body (as
necessary) to ensure a water tight seal on
mounting nut.
D.
Attach temperature dial.
11. Reverse procedure from step 6 to complete the
installation.
12. Check calibration as outlined under

TEMPERATURE CONTROLLER

CALIBRATION.
POWER SUPPLY BOX
COMPONENTS
WARNING: DISCONNECT THE
ELECTRICAL POWER TO THE
MACHINE AND FOLLOW LOCKOUT /
TAGOUT PROCEDURES.
CAUTION: Certain components in this system
are subject to damage by electrostatic discharge
during field repairs. A field service grounding kit
is available to prevent damage. The field service
grounding kit must be used anytime a control
board is handled.
1.
Remove front panel as outlined under
COVERS AND PANELS.
2.
Remove power supply box cover.
3.
Remove the component being replaced.
4.
Reverse procedure to install the replacement
component then check for proper operation.
TEMPERATURE CONTROLLER
1.
Remove control box from the control panel as
outlined under COVERS AND PANELS.
2.
Disconnect lead wires from temperature
controller.
3.
Remove temperature controller from control
box.
Page 5 of 32
WARNING: DISCONNECT THE
ELECTRICAL POWER TO THE
MACHINE AND FOLLOW LOCKOUT /
TAGOUT PROCEDURES.
F25121 (February 2003)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vg40Ml-126847Ml-126848

Table of Contents