Important - For Massachusetts Installations - Watts AERCO Edge CFR 3000 Operator's And Service Manual

Boiler with edge controller, natural gas modulating boilers
Hide thumbs Also See for AERCO Edge CFR 3000:
Table of Contents

Advertisement

SECTION 1 SAFETY PRECAUTIONS
1.4 IMPORTANT – For Massachusetts Installations
The boiler must be installed by a plumber or a gas fitter who is licensed within the
Commonwealth of Massachusetts.
Prior to unit operation, the complete gas train and all connections must be leak tested
using a non-corrosive soap.
The vent termination must be located a minimum of 4 feet above grade level.

Advertisement

Table of Contents
loading

Table of Contents