SECTION 1 SAFETY PRECAUTIONS
1.4 IMPORTANT – For Massachusetts Installations
•
The boiler must be installed by a plumber or a gas fitter who is licensed within the
Commonwealth of Massachusetts.
•
Prior to unit operation, the complete gas train and all connections must be leak tested
using a non-corrosive soap.
•
The vent termination must be located a minimum of 4 feet above grade level.
•
•
•