52 Connecting the cables
6. Push cables through the tight openings in the cable plate, through the gasket
and then strip down the cables.
7. Strip down the cables to 10 cm and crimp the ferrules on each wire using an
appropriate crimping tool. Leave 2 cm of the cable screen.
8. Locate the green connectors with high-speed channels marked HSChxx. Check
the polycarbonate protecting sheet to identify the channel .
HSCh3 HSCh2 HSCh1
9. The sensor mounting position on the rotating machinery and its connection
inside the DAU are predefined in the ABB Ability™ Smart Sensor mobile
application during commissioning. For more information, see section
Commission the MACHsense-R (page
HSCh0
RTN IN
32).