2. Getting started

The usual functions (display force or torque, display maximum, zero and change units) can be
2.1.
accessed simply by using the keys on the keypad.
Connect the AC adapter to the micro-USB connector on the left-hand side of your instrument. The
green LED on the front panel lights up when the battery is charging. When charging is complete, the
LED goes out.
2.2.

2.2.1. Internal sensor force gauge

Attach the extension cable supplied in the case to the load cell stem at the bottom of the force gauge.
Tightening should be done by hand, without applying excessive torque. Excessive torque or the use of
pliers can damage the load cell. We recommend that you fit the accessories with the force gauge
switched on, to ensure that you do not apply a heavy load to the load cell when fitting the accessories.

2.2.2. External sensor force gauge type S2 or S9

Mounting precautions for S2 and S9 external load cell force gauges are :
S2 and S9 force load cells are fitted with strain gauges. These are protected by white silicone.
Your accessories, screws, etc. must not come into contact with this silicone. This would prevent
measurement and risk destroying the sensor.
Torsion, bending and shear loads are disruptive factors and should be avoided.
S2 sensor :

Battery charging

Accessories assembly

- 7 -
Instruction manual
CENTOR EASY II

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CENTOR EASY II and is the answer not in the manual?

Questions and answers

Table of Contents