Environment Requirement; Tool Required For Installation - Delta SEG-48100-02I Operation Manual

48v 3u lithium-ion battery module
Table of Contents

Advertisement

1. Make sure that the power system connected to the battery is a qualified communication
power system.
2. When installing the battery, please make sure that the power supply system is in the off
state without current, and that the battery module is turned off.
3. There must be a corresponding level of insulation measures for the power cables. It is
forbidden to have exposed power cables.
4. Ensure that the battery and power system are grounded reliably during installation
3.2

Environment Requirement

The installation environment must meet the product operating temperature, storage
temperature, relative humidity, and atmospheric pressure requirements. The installation site
must be free from conductive dust and corrosive gases, explosion hazards, vibration bumps,
and away from heat and fire sources
3.3

Tool Required For Installation

Before removing the battery module from the box, inspect the cartons/box for any damage.
Then check the integrity of the parts to see if any damage. If this happens, contact the
shipping staff immediately.
The following tools list are provided for reference when installing the system
Installation Tool
Installation and User's Manual
Screwdriver (slot, cross)
Wrench
Long nose pliers
Wire stripper
Clipping pliers
09
Installation Tool
Diagonal Cutting Pliers
Meter
Current Meter
Insulation tape
Anti-static bracelet
Cable tie

Advertisement

Table of Contents
loading

Table of Contents