Riello DB 12 LSE C13 A0 FS1 FR Installation, Use And Maintenance Instructions page 36

Industrial dual fuel burners
Table of Contents

Advertisement

Available languages

Available languages

5.3
Pressure switches adjustment
As the reference pressure levels cannot yet be established, before beginning setting operations, the following must be carried out
(with the burner turned off):
open the manual valves upstream from the gas train;
adjust the minimum gas pressure switch (Fig. 18) on the gas train, at the start of the scale;
adjust the maximum gas pressure switch (Fig. 19), on the butterfly valve, at the end of the scale;
adjust the air pressure switch (Fig. 20) on the burner air box, at the start of the scale.
Minimum gas pressure switch
D2214
Fig. 18
14
CHAPTER
Maximum gas pressure switch
D2213
Fig. 19
5
Preparation for start up
Air pressure switch
D2215
Fig. 20

Advertisement

Table of Contents
loading

This manual is also suitable for:

Db 12 lse c13 a0 fs1 fl2005088920050888

Table of Contents