Riello DB 12 LSE C13 A0 FS1 FR Installation, Use And Maintenance Instructions page 32

Industrial dual fuel burners
Table of Contents

Advertisement

Available languages

Available languages

3
Installation
3.1
Fixing to the boiler
Fettling
S8525
A
Fig. 12
3.2
Lifting points
To move the burner, the attachment points indicated in Fig. 13 should be used.
20051926
10
The figure alongside shows how to fix the burner to a boiler without a cooled
frontal.
In any case, the fettled wall should not extend beyond the end of the burner
combustion head.
mm
A
464
Fig. 13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Db 12 lse c13 a0 fs1 fl2005088920050888

Table of Contents