Mezzanine card installation determines bay assignments for interconnect module installation. For more
information on the association between the mezzanine connector and the interconnect bays, see the
following documentation:
HP BladeSystem c7000 Enclosure Setup and Installation Guide
HP BladeSystem c3000 Enclosure Setup and Installation Guide
HP BLc Intel
For specific port connections for each server blade, see the HP BladeSystem Onboard Administrator User
Guide. Connections differ by blade type. The information in this guide explains cabling between an HP
®
BLc Intel
4X QDR InfiniBand Managed Switch and the network switches.
The HP Onboard Administrator screen example (see
Figure 2

HP Onboard Administrator Screen Example

NOTE:
The HP's Onboard Administrator (OA) will not distinguish between a managed switch and a
non-managed switch.
You can install up to 16 InfiniBand cables in the uplink ports on an Intel
An external subnet manager (not included with a Intel
topology for the InfiniBand fabric.
6
Preparing for Installation
®
4X QDR InfiniBand Switch Cable Management Kit Installation Guide
Figure
2) is a reference for port mapping.
®
BLc 4X QDR InfiniBand Switch.
®
BLc 4X QDR InfiniBand Switch) manages the

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BLc Intel 4X QDR InfiniBand and is the answer not in the manual?

Questions and answers

Table of Contents