Installation of Switch Management Module
This appendix provides the procedures for installing the Switch Management Module. The Switch
Management Module is not a Field Replaceable Unit (FRU) and is installed in the managed version of the
®
HP BLc Intel
To install the Switch Management Module in an HP BLc Intel
the steps below:
1.
Unscrew and remove the screw (see callout 1 in
Figure
10).
Place the screw to the side to be reused.
Figure 10

Location of the Switch Management Module Blank Cover.

2.
Remove the blank cover (see callout 2 in
3.
Insert the Switch Management Module Assembly
callout 1in
Figure 11

Switch Management Module Assembly

4X QDR InfiniBand Managed Switch.
1
Figure
12).
HP BLc Intel® 4X QDR InfiniBand Switch Hardware Installation Guide
®
4X QDR InfiniBand Managed Switch, follow
Figure
10) on the blank cover (see callout 2 in
2
Figure
10) and discard.
(Figure
11) on the switch at the pivot points (see
1
19

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BLc Intel 4X QDR InfiniBand and is the answer not in the manual?

Questions and answers

Table of Contents