Positioning The Rooftop Component; Preparing To Work Inside The Rv - Dometic FreshJet3 Series Installation Manual

Rooftop air conditioner (air distribution box, wall thermostat controls)
Hide thumbs Also See for FreshJet3 Series:
Table of Contents

Advertisement

Rooftop Air Conditioner (Air Distribution Box, Wall Thermostat Controls)
7 .4 .7 Routing an automatic generator
start (AGS) feature via RV-C (optional)
If installing an AGS feature, you must complete one of
the following actions:
• If the generator is equipped with RV-C
communication capabilities and an AGS device:
1. Ensure that the generator and AGS device are
configured on the network.
2. Set the values relevant to the AGS as prescribed
by the RV-C specifications.
• If the generator is equipped with RV-C
communication capabilities but not equipped with an
AGS device:
1. Install an RV-C compliant AGS interface device
on the network.
2. Set the values relevant to AGS as prescribed by
the RV-C specifications.
7 .5 Positioning the rooftop
component
NOTICE: Do not slide the rooftop component along
a surface or damage to the gasket on the bottom of the
rooftop component could occur and cause a leak.
1. Remove all the contents from the carton and discard
the carton.
2. Place all the ADB kit contents in the RV. The ADB kit
contains mounting hardware for the ADB that will be
installed inside the RV.
3. Move the rooftop component to the roof.
10 Placing the Rooftop Component
EN
q q
w w
Front of the rooftop
q
component
4. Lift and place the rooftop component over
the prepared opening using the gasket on the
rooftop component as a guide.
I
The outside work is complete. Minor adjustments
can be made from inside the RV if required.

7 .6 Preparing to work inside the RV

This section describes the interior preparation.
1. Confirm the ADB kit is inside the RV.
q q
11 Centering the rooftop component from inside the RV
Roof gasket
q
2. From inside the RV, check the gasket alignment of
the rooftop component over the roof opening. If
necessary, adjust the rooftop component from below
by gently pushing up.
q q
12 Return Air Opening
Wiring harness
q
Pre-installation
Roof opening
w
w w
Ceiling thickness
w
15