MTPro operation manual
Figure 3-4 Back side of single fiber fixture
1——Fixture lock handle.
2——Position piece guide.
3——Ferrule insert hole
4——Lock screw hole
5——Fixture main body.
6——Back block for positioning.
3.3 APC Positioning Piece
SC/APC
LC/APC
FC/APC
Figure 3-5 Single Positioning Pieces
SC/APC Positioning Piece——For testing SC/APC connector.
FC/APC Positioning Piece—— For testing FC/APC connector.
LC/APC Positioning Piece—— For testing LC/APC connector.
Remarks: Take a caution to the position of the mark when install the positioning piece. Keep
the mark up side to install the position piece.
12