2.4.2 Rebuild - NEC N8100-2834F Maintenance Manual

Express server
Table of Contents

Advertisement

Chapter 2 Useful Features
6.
Set the parameter of settings as shown below .Click the Submit Changes once finished the settings.

2.4.2 Rebuild

1.
Replace a physical device, and then rebuild operation will automatically start.
2.
The rebuilding is under running as below figures. (Status: Rebuilding)
Tips
The progress of rebuilding should be checked in SSA (Smart Storage Administrator) under
OS.
86
Express5800/R120h-1M, R120h-2M (3rd-Gen) Maintenance Guide
2. RAID System Configuration

Advertisement

Table of Contents
loading

Table of Contents