Trane RTXC-XE Series Installation, Operation And Maintenance Manual page 19

Air-cooled screw chiller heat pump
Table of Contents

Advertisement

RTXC-SVX003D-EN
Fin-tube coil damage!
Use properly sized lifting beam crossbars to avoid crushing fin-tube coils of the unit with lifting
chains.
3.
Each of the cables, chains or slings used to lift the unit must be capable of supporting the
entire weight of the unit. See
4.
keep cables or chains clear of unit sides. As further protection, plywood sheets may be placed
against sides of unit, behind cables or chains.
5.
After test lift unit at minimal height to verify even level lift, raise and set unit down carefully.
Avoid shocks or rolling while handling.
6.
Remove the lifting tools after the unit on place.
Alignment and Spacing between Master and Slaver Units!
Keep units' level and aligned and guarantee 300mm distance on the length direction between
Master and slaver unit of 310/330/360/400/440XE, 310/330/360/400/440/500/560XE-HSE.
Figure 4. RTXC-XE/XE-HSE Rigging
Figure 4-1. Rigging – RTXC110XE, 110/130/140XE-HSE
Figure 4-2. Rigging – RTXC160/180XE, 160/180XE-HSE
NOTICE
Table
2.
NOTICE
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rtxc-svx003d-en

Table of Contents