Installation Installation Requirements Identify a suitable location for the E4 unit. It should be positioned within 2.0m of suitable services connections. Allow 15cm of free space at the rear for ventilation. The E4 unit must be installed in accordance with the relevant requirements of: The appropriate building regulations by application of either The Building Regulations (England and Wales), The Building Regulations (Scotland) or The Building Regulations (Northern Ireland).
Operation Tap Control Panel 1. Unlock Button (commissioning mode), 2. Chilled Dispense, 3. Sparkling Dispense, 4. Hot Dispense, 5. Warning Symbol. Note: CSH Version shown Basic Functions Dispensing cold water from unit: Press and hold dispense icon and release to finish dispense Dispensing hot water from unit: Press the unlock icon and then press and hold the hot button to dispense.
Page 3
E4 Installation & Water Connection Connect to the water supply. Connect the CO2 supply from gas Connect the chiller to the electricity regulator, ensuring the pressure is set to supply and ensure unit is switched on. max 58 PSI (4 bar), and turn on the supply (See CO2 Installation section).
Page 4
CO2 Bottle Installation - Sparkling Versions Only Unpack CO2 Regulator and fit elbow Attach the regulator to the disposable Connect the assembled CO2 bottle fitting to spigot outlet. CO2 bottle, ensuring the small and regulator to the CO2 inlet using a pressure relief vent in the stem is facing ¼”...
Page 5
NOTE: Sparkling water flow rate factory setting = 2.4L per minute MAX. This may need adjusting depending on inlet pressure. To do so follow below steps: Remove the 2 screws Remove the right hand side Locate the flow control Flow can then be adjusted holding the unit lid down panel screws.