8.
Route and connect the data and power cables.
For more information, see 2 SFF Drive controller cabling or 2 SFF: NVMe drive direct attach cabling
9.
Install the access panel.
10. Install the server in the rack.
11. Connect each power cord to the server.
12. Connect each power cord to the power source.
13. Power up the server.
14. Install drives.
Installing an 8 SFF display port/USB/optical blank option
Prerequisites
Before installing this option, be sure that you have the following:
•
The components included with the hardware option kit
•
T-10 Torx screwdriver
•
An optical drive, if installing
For more information, contact a Hitachi Vantara authorized reseller.
Procedure
1. Back up all server data.
2. Power down the server (Power down the server).
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
Hardware options installation