ICON Health & Fitness NETL20719.0 User Manual page 13

Table of Contents

Advertisement

13. Start eight #8 x 3/4" Truss Head Screws (24) into
the Pulse Crossbar (80), and then tighten them;
do not overtighten the Truss Head Screws.
14. Set the Left Handrail Top Cover (73) on the left
Handrail (74). Start four #8 x 3/4" Truss Head
Screws (24) into the Left Handrail Bottom Cover
(75), the left Handrail, and the Left Handrail
Top Cover. Next, slide the Left Handrail Top
and Bottom Covers forward against the console
assembly (H) as shown. Tighten the two middle
Truss Head Screws first. Then, tighten the other
two Truss Head Screws
Attach the Right Handrail Top and Bottom
Covers (81, 82) to the right Handrail (74) as
described above.
13
24
14
H
73
74
24
75
24
Tighten
First
13
80
24
24
24
81
74
82
24
Tighten
First
24

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nordictrack commercial 1750

Table of Contents