Download Print this page

Scosche ITCFDOSAB Manual page 4

In-dash installation kit for 2015-up ford mustang single zone manual/ dual zone automatic climate controls

Advertisement

INSTALLATION GUIDE
Panel Preparation
STEP 8
Panel Preparation
Remove fifteen (15) screws and the 12V socket located
behind the OEM climate control'panel and retain for later
installation; then remove the PCB board back cover.
NOTE:
The amount of screws may vary with vehicle model.
Retain the 12V socket from the OEM panel and place it on
the aftermarket panel.
STEP 9
Panel Preparation
Remove the seven screws
securing
the PCB board to the
panel; then remove from panel.
NOTE:
The amount of screws may vary with vehicle model.
n•P 1 O
Panel Preparation
Lift
and remove the plastic CD insert slot away from its
general location.
Close-up
STEP
11
Panel Preparation
Lift
and remove the drive train/ ignition controls
and rubber pad from the OEM panel and retain for
later install.
NOTE:
Remove rubber and plastics blocking pieces
needed in-order to remove the ignition controls
(See
image
on the right).
©2021 SCOSCHE
INDUSTRIES,
INC.
4
ITCFDOSAB
10/21

Advertisement

loading