Steam connection

For steam-heated machine variants, the steam connection must only
be carried out by an authorized installation technician. The steam
valve and the condensate separator are available from Miele Cus-
tomer Service.

Drainage

Drain valve DV on machine side DN 70, on-site socket DN 70. Flow
rate temporary 200 l/min.
If the slope for drainage is extremely steep, the piping must be vented
to prevent a vacuum from forming in the washing machine's drainage
system.
Foam and vapor venting kit BWS
If excessive suds form, foam may escape from the vapor extraction.
To remove the foam, an optional vapor venting kit (BWS) can be
used.

Electrical connection

The electrical connection must only be carried out by a suitably quali-
fied electrician in accordance with local and national regulations.
Tip: Open the machine lid. The connection points are located on the
machine frame.
When installing a residual current device (RCD), it must be Type B.
The voltage is stated on the data plate.
For hard-wired machines, an all-pole means of deactivation must be
provided on site. Switches with a minimum contact gap greater than
1/8" (3 mm) are suitable disconnectors.
The plug connector or isolator switch should be easily accessible at
all times.
If the machine is disconnected from the electricity supply, the isolator
must be lockable or the point of disconnection must be monitored at
all times.
Please check the enclosed wiring diagram.