Programming
After M0 (Execution command) is turned on, the error operation FB is executed.
When M5 (Module error flag) is off, M10 (Execution command) is turned on and the count permit command is turned on.
After M12 (Normal completion) is turned on, M14 (Count in operation) is turned on if the count operation is in progress.
4 APPLICATION EXAMPLE
40
4.1 Error Monitoring and Count Enable Operation