Delta M100-212 Operation And Installation Manual page 32

Grid-tie transformerless solar inverter
Table of Contents

Advertisement

Installation
External PE terminal
To ground the inverter, please crimp the grounding wire to the ring terminal lug
and fix it on the grounding point shown as figure 3-14.
* Screw: M8 (wall mount)
* Screw torque: M8/ 10 N•m (ground mount)
Figure 3-14: Mount the equipment grounding
32