Installation And Component Assembly; Levelling The Evaporator; Illustration 1 | Sections For Levelling The 6-Legged Evaporator - Lapierre VISION User Manual

Evaporator
Table of Contents

Advertisement

SECTION 4 INSTALLATION AND COMPONENT ASSEMBLY
4.1

LEVELLING THE EVAPORATOR

Once located, make sure that the conditions set out in Section 3.1.1: Determining the location of the evaporator,
are met.
IMPORTANT | It is very important that the evaporator is level and perfectly horizontal for proper operation.
Levelling can be done with the pans in place or with the evaporator combustion chamber alone.
The evaporator is equipped with 4 or 6 legs depending on the model. These legs are height-adjustable to
enable the equipment to be levelled. Below you will find the steps to follow.
Evaporator with 4 height adjustable legs
• Evaporator LEFT-RIGHT level.
a. Using a level, adjust the left and right legs of the front section of the evaporator to bring it perfectly level.
b. Repeat step (a) for the rear section of the evaporator.
• Evaporator FRONT-REAR level.
a. From the front and using a level, adjust the left rear leg of the evaporator to bring it perfectly level.
b. Repeat step (a) for the right side of the evaporator.
• Check all left-right and front-rear levels and adjust as necessary until the evaporator is perfectly level. You may
need to repeat this step a few times.
Evaporator with 6 height adjustable legs

ILLUSTRATION 1 | Sections for levelling the 6-legged evaporator

SECTION
FRONT
SECTION
AVANT
1. The front-centre section extends from the front section of the evaporator to the centre leg.
2. The centre-rear section extends from the centre leg of the evaporator to the rear section.
Lapierre Equipment |
PATTES
CENTRAL
CENTRALES
LEG
SECTION AVANT-CENTRE (1)
FRONT-CENTRE SECTION (1)
VISION EVAPORATOR
VUE DE CÔTÉ
SIDE VIEW
SECTION CENTRE-ARRIÈRE (2)
CENTRE-REAR SECTION (2)
| USER MANUAL | Version 03 - March 2023
10
SECTION
REAR
SECTION
ARRIÈRE

Advertisement

Table of Contents
loading

Table of Contents