Lapierre VISION User Manual page 29

Evaporator
Table of Contents

Advertisement

APPENDIX A
3.
RIGID PANEL (above the door opening)
• When the sides are bricked in, trim as needed and add the rigid panel section (supplied) above the door
opening (D).
• Fasten the panel using the lugs (supplied) to the factory pre-installed rods, as shown in the following image.
4.
DRYING THE MORTAR
• Wait about 24 hours, depending on the drying conditions, for the mortar to solidify.
• Once the mortar has solidified, check:
- if there are cracks in the mortar,
- and if there are voids between the bricks.
If so, repair the cracks and fill the voids with high-temperature mortar and allow to dry.
5.
INSULATING MAT
The insulating mat is installed in the rear section of your evaporator (E).
Lapierre Equipment |
Installation instructions for insulating materials (continued)
D
VISION EVAPORATOR
E
Evaporator rear section
| USER MANUAL | Version 03 - March 2023
27

Advertisement

Table of Contents
loading

Table of Contents