Lapierre VISION User Manual page 31

Evaporator
Table of Contents

Advertisement

APPENDIX A
• Riser and rear section
- Starting at the end of the bricks of the floor riser (H), cover the bottom, the riser and its ramp, then the
bottom and the back wall of the rear section with 2 in. (5.08 cm) insulating mat, as shown in the following
images (I).
- Follow the instructions in the installation diagrams for your VISION evaporator model. For these instructions,
refer to Appendices B to I.
H
If your EVAPORATOR is 36 IN. (91.44 CM) WIDE, proceed with the following instructions.
- Starting at the end of the bricks of the floor riser (H), cover the bottom, the riser and its ramp, and then the
bottom of the rear section with two layers of 1 in. (2.54 cm) insulating mat.
- Follow the instructions in the installation diagrams for your VISION evaporator model. For these instructions,
refer to Appendices B to I.
Lapierre Equipment |
Installation instructions for insulating materials (continued)
VISION EVAPORATOR
I
| USER MANUAL | Version 03 - March 2023
29
I

Advertisement

Table of Contents
loading

Table of Contents