Preparing The Valve For Service Work - Samson 2404-2 Mounting And Operating Instructions

Excess pressure cwith pilot valve
Table of Contents

Advertisement

Servicing
Note
The regulator was checked by SAMSON
before it left the factory.
− Certain test results certified by SAMSON
lose their validity when the regulator is
opened. Such testing includes seat leakage
and leak tests.
− The product warranty becomes void if ser-
vice or repair work not described in these
instructions is performed without prior
agreement by SAMSON's After-sales Ser-
vice.
− Only use original spare parts by
SAMSON, which comply with the original
specifications.
Tip
SAMSON's After-sales Service can support
you in drawing up an inspection and test
plan for your plant.
9-2
9.1 Preparing the valve for
service work
1. Lay out the necessary material and tools
to have them ready for the service work.
2. Put the regulator out of operation (see
the 'Decommissioning' section).
Tip
We recommend removing the regulator from
the pipeline before performing any service
work (see the 'Removing the regulator from
the pipeline' section).
Contact SAMSON's After-sales Service to
have service work performed.
EB 2540 EN

Advertisement

Table of Contents
loading

Table of Contents