Gas - Installation Done Correctly - Rational SelfCookingCenter SCC WE Training Manual

Table of Contents

Advertisement

Drain - Installation done correctly
SCC_XS
40-50mm
Drain lines of CombiDuo shall not be brought together and combined
unless a p-trap (syphon) is integrated in each drain line.
The floor drain shall be equipped with a grease trap.
Drain connection of 201 and 202 and CombiDuo must be done via a
floor drain with integrated P-trap.

Gas - Installation done correctly

Gas installation has to be done according to the local rules and regulations.
Gas installation shall only be done by trained and approved technicians!
Confirm the available gas type in the kitchen.
G20 Natural gas H
G25 Natural gas L
G30 Liquified gas 3B/P
G31 Liquified gas 3P NA
13A Natural gas Japan
US
Natural gas
This gas type must be identical with the gas type listed on the unit data plate.
Observe the gas power rating of the unit!
The diameter of the gas supply line must be capable to support all connected consumers.
Unit XS60 is not available in Gas configuration.
V07 en, Basic_Installation_Accessories
201-202
NA
Drain connection of SCC_XS is 40mm.
It must be installed with permanent slope down.
An adapter 40-50mm (50.01.967) is provided with
the unit as well as 90 degree elbow 2070.0050.
Installation kits with Female recptacle included
in kit are available for XS60
- 21 -
US/Canada 12/2018

Advertisement

Table of Contents
loading

This manual is also suitable for:

Selfcookingcenter scc xsCombimaster plus cm p

Table of Contents