Download Print this page

Mercia Garden Products 03DTSHHP1206HGD4MW-V1 General Instructions Manual

12x6 clover summerhouse

Advertisement

Quick Links

General Instructions
03DTSHHP1206HGD4MW-V1 & 03DTMBHP1206RFP
12x6 Clover Summerhouse
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screw-
driver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
LOCATION FOR YOUR GARDEN BUILDING
A minimum of 60cm should be left around the perimeter of your garden building to allow access for maintenance,
annual treatment and to allow air ow around the building.
Where possible you should avoid placing your garden building underneath large trees to prevent the tree causing
damage to the building.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions. For the duration of heavy or
extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during
excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be
helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine
and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent
the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treatment
to prevent water ingress
Pressure Treated buildings - Require a waterproof treatment to prevent water ingress
Log Cabins - Are supplied untreated and require a preservative and waterproo ng treatment.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base dimensions,
The base should be slightly smaller than the external measurement of the building, i.e. The cladding should overlap
the base, creating a run o for water. It is also recommended that the oor be at least 25mm above the surrounding
ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or
using this product.
Refer to the instructions pages for your speci c product code
Please retain product label and instructions for future reference
x2
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly, you
will need a tape measure to
check dimensions of
components.
**Protim Aquatan T5 (621)**
Your building has been dip treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
REGISTER FOR YOUR
ANTI-ROT
GUARANTEE TODAY
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Screws & Nails
Bolts
To identify the
xings required
for each step use a
Measure
Measure
overall
under the
measuring tape.
length
head
PLEASE SCAN HERE:
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 03DTSHHP1206HGD4MW-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 03DTSHHP1206HGD4MW-V1

  • Page 1 Please retain product label and instructions for future reference All building’s should be Winter = High Moisture = Expansion erected by two adults Summer = Low Moisture = Contraction 03DTSHHP1206HGD4MW-V1 & 03DTMBHP1206RFP 12x6 Clover Summerhouse BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY For ease of assembly, you CAUTION - Check the pack and make sure you have all the parts listed.
  • Page 2 03DTSHHP1206HGD4MW-V1 & 03DTMBHP1206RFP Please retain product label and instructions for future reference Overall Dimensions: Width = 3690mm Roof Bearer A - 44x58x2211mm QTY 1 Depth = 1868mm Height = 2584mm F4458-G-2251mm (2x32° CUTS) Base Dimensions: Press Lock QTY 1 Width = 1753mm...
  • Page 3: Side View

    Please retain product label and instructions for future reference Step 1 Nail Bag Parts needed - No. 21 QTY 1 No. 24 QTY 1 There may be extra screws present in the nail bag 70mm Screw x 15 30mm Screw x 136 Secure the Door Strip (No.
  • Page 4 Please retain product label and instructions for future reference Step 4 Step 3 Parts needed - No. 4 QTY 2 Parts needed - No. 1 QTY 2 No. 12 QTY 1 No. 13 QTY 1 Secure the oors (No. 1) together No.
  • Page 5 Please retain product label and instructions for future reference Step 6 Step 5 Parts needed - No. 3 QTY 2 Parts needed - No. 11 QTY 2 No. 5 QTY 2 Secure the Small Floor Panels (No. Fix the Side Window Panel (No. 3) 11) to the oors assembled in the and the Plain Panel (No.
  • Page 6 Please retain product label and instructions for future reference Step 7 Step 8 Parts needed - No. 2 QTY 2 Parts needed - No. 2 QTY 1 No. 5 QTY 2 No. 3 QTY 1 No. 5 QTY 2 Fix the Back Panel (No. 2) and the Plain Panel (No.
  • Page 7 Please retain product label and instructions for future reference Step 12 Step 10 Parts needed - No. 4 QTY 2 Parts needed - No. 3 QTY 1 No. 5 QTY 1 Place the already assembled Door Panel (No. 4, 6,12,13,22 & 25) into Place the Plain Panel (No.
  • Page 8 Please retain product label and instructions for future reference Step 14 Step 15 Parts needed - No. 7 QTY 2 Parts needed - No. 14 QTY 1 SIDE VIEW No. 8 QTY 2 No. 15 QTY 5 No. 9 QTY 2 No.
  • Page 9 Please retain product label and instructions for future reference Step 18 Step 17 Parts needed - No. 14 QTY 1 Parts needed - No. 8 QTY 2 No. 16 QTY 5 No. 9 QTY 2 No. 10 QTY 2 Fix the Roof Blocks (No. 16) to Roof Bearer A (No.
  • Page 10: View From Above

    Please retain product label and instructions for future reference Step 19 Step 20 Parts needed - No. 7 QTY 1 Parts needed - No. 7 QTY 2 No. 14 QTY 1 No. 8 QTY 1 No. 9 QTY 1 No. 10 QTY 1 Place one of the 6Ft Roof Panels (No.
  • Page 11 Please retain product label and instructions for future reference Step 21 Step 23 Parts needed - No. 8 QTY 1 No. 9 QTY 1 Once all four roof sides are on the No. 10 QTY 1 building, pull the corners together and secure underneath the roof as shown.
  • Page 12 Please retain product label and instructions for future reference Step 26 Step 24 Parts needed - No. 25 QTY 1 Fix the roofs to the panels below by screwing down Attach the Flat Roof Strip (No. 25) through the roofs into the to the top of the Summer House by panel framing below using screwing into each block below..
  • Page 13 Please retain product label and instructions for future reference Step 28 Step 29 Parts needed - No. 34 previously Parts needed - No. 19 QTY 4 cut in to pieces in step 14. No. 20 QTY 2 Position the four largest pieces Secure the Fascias (No.
  • Page 14 Please retain product label and instructions for future reference Step 31 Step 32 Parts needed - No. 20 QTY 1 Parts needed - No. 26 QTY 12 No. 33 QTY 2 Fix the Cover Trims (No. 26) to each Fix the already assembled (in Step 30) corner and over each join of the Finials (No.
  • Page 15 Please retain product label and instructions for future reference Step 33 Step 35 Parts needed - No. 23 QTY 2 Parts needed - No. 29 QTY 1 No. 30 QTY 2 Fix the Window Strips (No. 23) to the top of each window opening On the internal of the doors, side panels...
  • Page 16 Please retain product label and instructions for future reference Step 38 Step 36 Parts needed - No. 37 QTY 2 Parts needed - No. 38 QTY 2 On the outside of the building Attach the door handles (No. 38) x the turn buttons (No. 37), to to the doors using the 35mm bolts the top and bottom of the included with the door handle.
  • Page 17 Please retain product label and instructions for future reference Step 40 Parts needed - No. 17 QTY 4 No. 18 QTY 8 Locate the Window Crosses (No. 17 & No. 18) into the windows. Fix by screwing through the Cross into the Window framing using 6x20mm screws, as shown in the diagram.
  • Page 19 REGISTER FOR YOUR PLEASE SCAN HERE: ANTI-ROT GUARANTEE TODAY...

This manual is also suitable for:

03dtmbhp1206rfp