Install The Thermal Sensor - Lenovo 7D8JA02GNA Maintenance Manual

Table of Contents

Advertisement

After you finish
1. Install a new thermal sensor, see
2. If you are instructed to return the component or optional device, follow all packaging instructions, and
use any packaging materials for shipping that are supplied to you.

Install the thermal sensor

Follow this procedure to install the thermal sensor.
S002
CAUTION:
The power-control button on the device and the power switch on the power supply do not turn off the
electrical current supplied to the device. The device also might have more than one power cord. To
remove all electrical current from the device, ensure that all power cords are disconnected from the
power source.
About this task
Attention:
1. Read
"Safety inspection checklist" on page iv
work safely.
2. Touch the static-protective package that contains the component to any unpainted metal surface on the
server; then, remove it from the package and place it on a static-protective surface.
Watch the procedure
A video of this procedure is available at YouTube:
AU3iY3F7lq3qfqr5caGbIu
Procedure
Step 1.
Install the thermal sensor.
a.
From the inside of the chassis, attach the end of the thermal sensor to the corresponding
slot on the front of the chassis.
b.
From inside of the chassis, push the thermal sensor into the slot.
c.
Make sure the thermal sensor is secured in place.
ThinkSystem ST50 V2 Maintenance Manual
156
"Install the thermal sensor" on page
and
.
156.
"Installation guidelines" on page 41
https://www.youtube.com/playlist?list=PLYV5R7hVcs-
to ensure that you

Advertisement

Table of Contents
loading

This manual is also suitable for:

Thinksystem st50 v2

Table of Contents