8.2 Filling out the Start-up operation report

Information from the nameplate entered?
SN:
E:
Bez:
Item-Nr.:
Obvious damage to the unit?
What and where?:
Unit levelled?
Unit fastened to floor?
secured against tipping
Screwed to floor
Glued to floor
Electrical connection made properly?
Potential equalization
Potential-free contact
Electrical connections made properly?
Fault current device connected directly before this unit?
Fault current device connected before this and other units?
Supply voltage measured?
Supply voltage:
Set transformer voltage
T1: blue 0 V | red
Temperature unit set?
°C
Software version identified?
Version:
Altitude set?
0 — 999 m (3277 ft)
2000 m (6560 ft) — 2499 m (8197 ft)
General information
Typ:
(if listed)
General information
Electrical connection
 V
Basic setting of the control
Installation instructions
secured against shifting
Screwed to floor
Glued to floor
Power optimization system
(V)
°F
1000 m (3280 ft) — 1999 m (6557 ft)
2500 m (8200 ft) or higher
Putting the unit into service
Yes
Yes
Yes
Yes
No
No
No
No