Putting the unit into service
8 Putting the unit into service
INFORMATION
Prerequisite Electrical connection made
8.1 Nameplate
48
If the unit is not put into service immediately after being connected and the
function check, all inspections must be repeated.
Water connection made
Wastewater connection made
Exhaust air connection made ( if required by the customer)
Function checked successfully
Housing closed
1. Instruct operator.
2. Fill out the Start-up operation report.
a
l
k
Image: Nameplate information
a Manufacturer
b Serial number
c Type number
d Protection class
e Frequency
f Barcode
Installation instructions
b
j
g
h
i
g Connection pressure for water
h Year of manufacture
i Type of connection
j Electrical connected load
k Manufacturer's web address
l Certificate
c
d
e
f