Installation Position; Installation With Flanged Connection - GEM 533 eSyStep Operating Instructions Manual

Motorized globe valve
Table of Contents

Advertisement

11 Installation in piping
NOTICE
Tools
▶ The tools required for installation and assembly are not
included in the scope of delivery.
Use appropriate, functional and safe tools.
1. Ensure the product is suitable for the relevant application.
2. Check the technical data of the product and the materials.
3. Keep appropriate tools ready.
4. Wear appropriate protective gear, as specified in the plant
operator's guidelines.
5. Observe appropriate regulations for connections.
6. Have installation work carried out by trained personnel.
7. Shut off plant or plant component.
8. Secure plant or plant component against recommission-
ing.
9. Depressurize the plant or plant component.
10. Completely drain the plant (or plant component) and let it
cool down until the temperature is below the media vapor-
ization temperature and cannot cause scalding.
11. Correctly decontaminate, rinse and ventilate the plant or
plant component.
12. Lay piping so that the product is protected against trans-
verse and bending forces, and also from vibrations and
tension.
13. Only install the product between matching aligned pipes
(see chapters below).
14. Please note the flow direction.
15. Please note the installation position (see chapter "Installa-
tion position").

11.2 Installation position

GEMÜ recommend installing the actuator vertically upright or
vertically down to optimise the service life.

11.3 Installation with flanged connection

Fig. 1: Flanged connection
NOTICE
Sealing material
▶ The sealing material is not included in the scope of deliv-
ery.
Only use appropriate sealing material.
GEMÜ 533 eSyStep
Positioner (Code S0)
Connector elements
▶ The connector elements are not included in the scope of
delivery.
Only use connector elements made of approved materi-
als.
Observe permissible tightening torque of the bolts.
1. Keep sealing material ready.
2. Carry out preparations for installation (see chapter "Pre-
paring for installation").
3. Ensure clean, undamaged sealing surfaces on the connec-
tion flanges.
4. Align flanges carefully before installing them.
5. Clamp the product centrally between the piping with
flanges.
6. Centre the gaskets.
7. Connect the valve flange and the piping flange using ap-
propriate sealing materials and matching bolting.
8. Use all flange holes.
9. Tighten the bolts diagonally.
10. Re-attach or reactivate all safety and protective devices.
26 / 64
NOTICE
www.gemu-group.com

Advertisement

Table of Contents
loading

Table of Contents