IBM 9006-12C Manual page 27

Power system
Table of Contents

Advertisement

Before you begin
Power off the system and place it in the service position. For instructions, see "Preparing the 9006-12C
system to remove and replace internal parts" on page 78.
Procedure
1. Attach the electrostatic discharge (ESD) wrist strap. The ESD wrist strap must be connected to an
unpainted metal surface until the service procedure is completed, and if applicable, until the service
access cover is replaced.
Attention:
v Attach an electrostatic discharge (ESD) wrist strap to the front ESD jack, to the rear ESD jack, or to
an unpainted metal surface of your hardware to prevent the electrostatic discharge from damaging
your hardware.
v When you use an ESD wrist strap, follow all electrical safety procedures. An ESD wrist strap is
used for static control. It does not increase or decrease your risk of receiving electric shock when
using or working on electrical equipment.
v If you do not have an ESD wrist strap, just prior to removing the product from ESD packaging and
installing or replacing hardware, touch an unpainted metal surface of the system for a minimum of
5 seconds. If at any point in this service process you move away from the system, it is important to
again discharge yourself by touching an unpainted metal surface for at least 5 seconds before you
continue with the service process.
2. Install the DOM into the system backplane, in positions (A), as shown in Figure 10. Depending on the
DOM model, you may also have to plug in a small power cord for the DOM. Ensure you plug the
connectors in properly.
Figure 10. Installing a DOM
3. Prepare the system for operation. For instructions, see "Preparing the 9006-12C system for operation
after you remove and replace internal parts" on page 80.
Removing and replacing parts in the 9006-12C
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lc921

Table of Contents