Do not use longer cable lengths than necessary for a good signal quality and to prevent
excess inductance.
According to IEC/EN 60079-14 intrinsically-safe conductors must only be installed such
that neither electric nor magnetic fields have any influence on these conductors. For this
reason they must be placed in a way that they cannot generate electric or magnetic fields
themselves, e.g. by coiling them up to more than one loop.
Hot surfaces resulting from hot process media
Risk of burns resulting from surface temperatures above 65 °C (149 °F).
• Take appropriate protective measures, for example contact protection.
• Make sure that protective measures do not cause the maximum permissible ambient
3.2

Site requirements

As required by IEC/EN 60079-25, a site risk analysis has to determine possible measures to
exclude any dangers from overvoltage. For zone 1 and 2, the surge protection of the optics
housing CD 6 can be used for this purpose. For zone 0, a separate surge protection must be
implemented outside zone 0.
3.2.1

Central unit and barrier box

Insufficient air circulation
Risk of fire.
The device may overheat in case of insufficient air circulation.
• Ensure sufficient air circulation in the room. Refer to the information in Technical data
LDS 6 & Optics housing CD 6 Compact Operating Instructions
Compact Operating Instructions, 12/2022, A5E03314905-AB
CAUTION
temperature to be exceeded. Refer to the information in Technical data (Page 59).