E-Drive/Blower/Blade Assembly Installation; Blower Cone Installation; Inlet Ring Installation - Peco 5920E Operator's Manual

Table of Contents

Advertisement

E-Drive/Blower/Blade Assembly
Installation
Remove the E-Drive assembly from the box. Place the
E-Drive on top of the mount arm as shown in Figure A.
Figure A
Housing Opening
Should Face Mower
Deck Discharge
Secure the E-Drive assembly to the engine mount arm
with (4) 5/16"-18 x 1" carriage bolts P#(K1144) and (4)
5/16"-18 locknuts P#(K2516). Refer to Figure B.
Figure B

Inlet Ring Installation

Pull the Locking Pin P#(K0095) up from the Inlet Ring P#(V1052). Position the 6" Inlet P#(E8010) into the Inlet Ring
and secure the 6" Inlet by pressing the Locking Pin back down. Refer to Figure A.
Figure A
Inlet Ring
E-Drive
Assembly
Mount Arm
(4) 5/16"-18 x 1"
Carriage Bolts &
(4) 5/16"-18 Locknuts
Locking Pin

Blower Cone Installation

Insert the blower cone as shown in Figure A and secure
with (2) 5/16"-18 x 2-1/2" Hex Bolts P#(K0125) and (2)
5/16"-18 Jam Nuts P#(K0120).
Figure A
6" Inlet
(2) 5/16"-18 x 2-1/2" Hex
Bolts P#(K0125) & (2)
5/16"-18 Jam Nuts
P#(K0120)
Blower
Cone

Advertisement

Table of Contents
loading

This manual is also suitable for:

5920eb7930e7930eb

Table of Contents