Mounting; Tubing Connections - Honeywell Satellite XT 9602-0400 FTT Manual To Operation

Table of Contents

Advertisement

9.5

Mounting

The Extractive Module XT is prepared for DIN-rail mounting. An appropriate mounting rail
is delivered with the instrument, which allows mounting the Extractive Module XT and the
Satellite XT side by side.
Mount this rail to a wall with the appropriate fasteners and slide both modules onto it.
Plug in male and female connector of Satellite XT and Extractive Module XT.
1
MST Extractive
Module Connections
Module Connections
sample tubing.
sample tubing.
sensor connection between Extractive Module XT and
Satellite XT.
sensor connection between Extractive Module XT and Satellite XT.
Data link and power supply.
Data link and power supply.
9.6

Tubing Connections

Tubing material is PTFE or PFA with an outer diameter of 1/4" and an inner diameter of
3/16". Length and inner diameter of the sample line will affect the response time. Length of
the sample lines should be kept as short as possible. With a sample line ID of 3/16"
(4.7 mm) and a length of 10 m, the delay in response does not exceed 30 seconds.
Sample Line Inlet
The fitting for connecting the sample line inlet is located on top of the housing and marked
"Gas Inlet". Improper installation of the sample inlet tube may result in dilution or even
complete loss of the sample.
Exhaust Line Outlet
The fitting for connection of the exhaust line outlet is located on top of the instrument and
marked "Outlet". Since hazardous gas concentrations may still be present at the exhaust
line outlet, it is recommended to connect the exhaust line to an exhaust duct.
Note:
If the pump is operated at the maximum sample line distance of 50 m, the maximum
exhaust line length is 25 m to avoid flow failure due to back pressure in the pump.
Note:
Do not apply power until the system is ready for start-up.
Satellite XT FTT Versions
Extractive Module XT - Section 9
esc
MST Satellite XT
set
9-4

Advertisement

Table of Contents
loading

Table of Contents