Nortel AccessNode 2016 User Manual page 171

Table of Contents

Advertisement

Table 6-12 (continued)
1344- to 2016-line expansion kit equipment (standard) for AN2016 Cabinet
PEC
P0891308
NT1W10AA
NTNR90CA
NTNR90DA
NTNR82ED
NTNR82EE
NTNR82EF
NTNR82EG
NT4K86NB
NT4K86NC
Cables, assemblies and kits to order
NTNR91AC
NT7E44JC
NTNR80AA
P0902427
Required options to order
B01231144 NT5C06CA-3
Note 1: Insert appropriate number of modules into rectifier shelves NT5C10CP-61 part of NTNR21AA.
Note 2: Four modules total are required for 2016 lines + (1) for redundancy.
Note 3: Refer to
"Optional battery backup" on page 6-45
required when the battery compartment holds the battery backup.
Note 4: Refer to
" Optional remote monitoring unit" on page 6-44
cable when optional RMU NTNR35AA is selected. A cable must be ordered for each additional AN ABM
NTNR10AA.
Description
Fan shelf faceplate
Shelf separator assembly
BIP #3 power distribution cable assembly, shelf 1-7
BIP #3 Talk battery cable assembly, shelf 1-7
ABM #3 CDS 4 A/B link cable assembly
ABM #3 CDS 5 A/B link cable assembly
ABM #3 CDS 6 A/B link cable assembly
ABM #3 CDS 7A/B link cable assembly
Shelf metallic test pair cable assembly, 3 ft long
Shelf metallic test pair cable assembly, 8 ft long
BIP # 3 power cable assembly
CNet bay cable provides communication links between ABM
shelves
14 pair cable assembly provides DS1 connectivity between
AccessNode and DSX panel
Cabinet label kit
MPR 25 rectifier module (see Notes 1 and 2)
—end—
Ordering information 6-35
for ordering battery string hook up cables,
for ordering RMU test access path
User Guide
Rel 1.0 Standard May 1999
Quantity
2
1
1
1
1
1
1
1
1
1
1
1
2
1
1 or 2

Advertisement

Table of Contents
loading

This manual is also suitable for:

An2016

Table of Contents