Startup - TCS QWL4.1 Installation Manual

Integrated building manager panel
Table of Contents

Advertisement

Installation

Startup

1. Verify all RS-485 connections from the controller network to the QWL4.1 are complete.
NOTE:
Refer to
Power and Communication Connections on page 7
2. Verify that all 24V power wiring to the controller network has been completed; all controllers are powered on and
each controller has been programmed with a unique RS-485 address.
3. Connect one end of the Ethernet cable to the Ethernet port 1 (C) on the QWL4.1 , and the other end to the network
port provided by the customer, or to a cell modem (if utilized).
4. Connect the power source to the QWL4.1 and apply power. If your QWL4.1 was preconfigured by the TCS factory or
another user, it will automatically go online and contact Ubiquity Cloud.
5.
You MUST call TCS Technical Support (800.288.9383 ext. 2) to verify connection and activate the unit.
6. If your QWL4.1's Panel Gateway was not ordered preconfigured: You can configure it at this time. See
Configuration on page
7. Using a computer connected to the Internet, open any web browser and go to the Ubiquity Cloud web site
(www.ubiquitysystems.net). Enter the login credentials provided to you at the time of sale. You will immediately
be prompted to change your login credentials. Once you have changed your login credentials, you will be able to
configure your QWL4.1 Building Manager.
Ubiquity login screen
13
13
16.
2800 Laura Lane • Middleton, WI 53562
for steps 2 through 5 below.
|
800.288.9383
|
www.tcsbasys.com
Gateway
Building Automation Systems

Advertisement

Table of Contents
loading

Table of Contents