Heat & Glo PIER-36TR-IFT Installation Manual page 30

Hide thumbs Also See for PIER-36TR-IFT:
Table of Contents

Advertisement

Top Vent - Vertical Termination - (continued)
Three Elbows
V
H
2
Figure 4.19
30
Heat & Glo • ST-36TR-IFT, PIER-36TR-IFT Installation Manual • 2482-980 Rev. D • 3/19
V
ELBOW ONLY
1 ft.
2 ft.
3 ft.
4 ft
6 ft.
2
INSTALLED
HORIZONTALLY
H
+ H
1
1
2
1 ft.
305 mm
305 mm
2 ft.
610 mm
610 mm
4 ft
1.2 m
914 mm
9 ft.
2.7 m
1.2 m
12 ft.
3.7 m
1.8 m
18 ft.
5.5 m
H
+ H
= 18 ft (5.5 m) Maximum
1
2
*No specific restrictions on this value EXCEPT
V
+ V
+ H
+ H
1
2
1
2
H
1
V
V
+ V
Minimum
2
1
2
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
cannot exceed 50 ft (15.2 m)
V
1
H
+ H
Maximum
1
2
1 ft.
305 mm
2 ft.
610 mm
4 ft
1.2 m
9 ft.
2.7 m
12 ft.
3.7 m
18 ft.
5.5 m

Advertisement

Table of Contents
loading

This manual is also suitable for:

St-36tr-ift

Table of Contents