Heat & Glo ST-36TR-IPI Owner's Manual
Hide thumbs Also See for ST-36TR-IPI:
Table of Contents

Advertisement

Models:
ST-36TR-IPI
ST-36TRLP-IPI
PIER-36TR-IPI
PIER-36TRLP-IPI
• Important operating
a n d m a i n t e n a n c e
instructions included.
WARNING:
FIRE OR EXPLOSION HAZARD
Failure to follow safety warnings exactly
could result in serious injury, death, or
property damage.
• DO NOT store or use gasoline or other fl am-
mable vapors and liquids in the vicinity of this
or any other appliance.
• What to do if you smell gas
- DO NOT try to light any appliance.
- DO NOT touch any electrical switch. DO
NOT use any phone in your building.
- Leave the building immediately.
- Immediately call your gas supplier from
a neighbor's phone. Follow the gas sup-
plier's instructions.
- If you cannot reach your gas supplier, call
the fi re department.
• Installation and service must be performed
by a qualifi ed installer, service agency, or the
gas supplier.
In the Commonwealth of Massachusetts installation must be
performed by a licensed plumber or gas fi tter.
See Table of Contents for location of additional Commonwealth
of Massachusetts requirements.
NOTICE
DO NOT DISCARD THIS MANUAL
• Read, understand and follow
these instructions for safe
installation and operation.
Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15
Owner's Manual
Installation and Operation
• Leave this manual with
party responsible for use
and operation.
DANGER
DO NOT TOUCH GLASS
NEVER ALLOW CHILDREN
TO TOUCH GLASS.
A barrier designed to reduce the risk of
burns from the hot viewing glass is provided
with this appliance and shall be installed for
the protection of children and other at-risk
individuals.
This appliance may be installed as an OEM
installation in manufactured home (USA
only) or mobile home and must be installed
in accordance with the manufacturer's
instructions and the Manufactured Home
Construction and Safety Standard, Title 24
CFR, Part 3280 in the United States, or the
Standard for Installation in Mobile Homes,
CAN/CSA Z240 MH Series, in Canada.
This appliance is only for use with the type(s)
of gas indicated on the rating plate. This
appliance is not convertible for use with other
gases, unless a certifi ed kit is used.
HOT GLASS WILL
CAUSE BURNS.
UNTIL COOLED.
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ST-36TR-IPI and is the answer not in the manual?

Questions and answers

Summary of Contents for Heat & Glo ST-36TR-IPI

  • Page 1 See Table of Contents for location of additional Commonwealth gases, unless a certifi ed kit is used. of Massachusetts requirements. Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 2: Congratulations

    00,000 00,000 00,000 00,000 MIN. MIN. INPUT INPUT BTUH: BTUH: 00,000 00,000 00,000 00,000 Serial Serial ORIFICE ORIFICE SIZE: SIZE: #XXXXX #XXXXX #XXXXX #XXXXX XXXXXXXX XXXXXXXX (Serie): (Serie): Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 3: Table Of Contents

    C. Install Support Brackets ......25 Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 4 D. Contact Information ......85  = Contains updated information. Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 5: Limited Lifetime Warranty

    3 years Firebox and heat exchanger Lifetime All replacement parts 90 Days beyond warranty period See conditions, exclusions, and limitations on next page. 4021-645G 2/15 Page 1 of 2 Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 6 THE EXTENT PROVIDED BY LAW, HHT MAKES NO EXPRESS WARRANTIES OTHER THAN THE WARRANTY SPECIFIED HEREIN. THE DURATION OF ANY IMPLIED WARRANTY IS LIMITED TO DURATION OF THE EXPRESSED WARRANTY SPECIFIED ABOVE. 4021-645G 2/15 Page 2 of 2 Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 7: Listing And Code Approvals

    • A 110-120 VAC circuit for this product must be protected with ground-fault circuit-interrupter protection, in compli- ance with the applicable electrical codes, when it is in- stalled in locations such as in bathrooms or near sinks. Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 8: Requirements For The Commonwealth Of Massachusetts

    VENT DIRECTLY BELOW. KEEP CLEAR OF ALL OB- of the installation. STRUCTIONS”. See Gas Connection section for additional Common- wealth of Massachusetts requirements. Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 9: User Guide

    • Keep remote controls out of reach of children. • Never leave children alone near a hot fi replace, whether Figure 2.1 General Operating Parts operating or cooling down. Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 10: Blower Kit (Optional)

    WARNING! Risk of Fire or Asphyxiation! DO NOT op- erate fi replace with fi xed glass assembly removed. Figure 2.3 Clear Space Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 11: Lighting Instructions (Ipi)

    Keep burner and control compartment clean. See installation and operating instruc- Propane Installation code, CSA B149.1. tions accompanying appliance. For additional information on operating your 593-913i Hearth & Home Technologies fi replace, please refer to www.fi replaces.com. Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 12: After Fireplace Is Lit

    Noise is caused by metal expanding and contracting as it heats up and cools down, similar to Metallic noise the sound produced by a furnace or heating duct. This noise does not affect the operation or longevity of the fi replace. Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 13: Maintenance And Service

    • Carefully set fi xed glass assembly in place on fi replace. Hold glass in place with one hand and secure glass latches with the other hand. • Reinstall decorative front. Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 14: Maintenance Tasks-Qualifi Ed Service Technician

    Use caution when cleaning these areas. Screw tips that have penetrated the sheet metal are sharp and should be avoided. • Remove all foreign objects. • Verify unobstructed air circulation. Figure 3.3 Replace Bulb Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 15: Burner Ignition And Operation

    • Verify that there is not a short in fl ame sense circuit by checking continuity between pilot hood and fl ame- sensing rod. Replace pilot as necessary. Figure 3.4 IPI Pilot Flame Patterns Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 16: Installer Guide

    HEARTH EXTENSION Note: Dual venting configurations ARE NOT allowed. Appliance MUST be vented EITHER vertically OR horizontally. SURROUND MANTEL AND MANTEL LEG (SECTION 5.D) Figure 4.1 Typical System Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 17: Design And Installation Considerations

    Flat blade screwdriver 1/2 - 3/4 in. length, #6 or #8 Self-drilling screws Caulk (minimum of 300ºF continuous exposure rating) One 1/4 in. female connection (for optional fan). Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 18: Framing And Clearances

    36 in. 36 in. 914 mm 914 mm PIER 36 in. 914 mm 36 in. 914 mm 36 in. 914 mm Figure 5.1 Appliance Locations Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 19: Constructing The Appliance Chase

    Opening Opening (Height) (Width) (Width) (Width) (Depth) Inches 38-1/8 34-1/8 Millimeters 1092 * Adjust framing dimensions for interior sheathing (such as sheetrock) Figure 5.2 Clearances to Combustibles ST-36TR-IPI Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 20 Opening (Height) (Width) (Width) (Width) (Depth) Inches 8-5/8 38-1/8 34-1/8 Millimeters 1046 * Adjust framing dimensions for interior sheathing (such as sheetrock) Figure 5.3 Clearances to Combustibles PIER-36TR-IPI Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 21: Mantel And Wall Projections

    Figure 5.8 Minimum Vertical and Maximum Horizontal Dimensions of Non-Combustibles MEASUREMENT FROM FIREPLACE OPENING TO BOTTOM OF APPLIANCE= 33-1/2 IN. Figure 5.6 Minimum Vertical and Maximum Horizontal Dimensions of Combustibles Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 22 Note: Clearance from opening to perpendicular wall. Figure 5.9 Combustible Mantel Leg or Wall Projections (Acceptable on both sides of opening) SHEETROCK 3.5 in. AIR SPACE REQUIRED Figure 5.10 Non-Combustible Zone Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 23: Termination Locations

    Over 16/12 to 18/12 ..........7.0 Over 18/12 to 20/12 ..........7.5 Over 20/12 to 21/12 ..........8.0 * 3 foot minimum in snow regions Figure 6.1 Minimum Height From Roof To Lowest Discharge Opening Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 24 2 sides beneath the fl oor. venting system does not meet these requirements. • Vinyl protection kits are suggested for use with vinyl siding. Figure 6.3 Minimum Clearances for Termination Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 25: Continue Adding Vent Components

    (2) sheet metal screws. C. Install Support Brackets Refer to cinch pipe and termination cap installation in- structions. Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 26: Vent Information And Diagrams

    DVP6 Effective DVP12 Height/Length DVP24 DVP36 DVP48 1219 DVP6A 3 to 6 76 to 152 DVP12A 3 to 12 76 to 305 Figure 7.2 DVP Pipe Effective Length Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 27: Vent Diagrams

    4 ft min. (1.22 m) 1/4 in. max. (6 mm) 16 ft max. (4.87 m) Figure 7.3 Minimum Installation Requirements for Two 45° Elbows-Top Vent-Horizontal Termination Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 28 15 ft. 4.6 m 6 ft. 1.8 m 18 ft. 5.5 m = 50 ft. (15.2 m) Maximum = 18 ft. (5.5 m) Maximum INSTALLED HORIZONTALLY Figure 7.5 Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 29 3.7 m 3 ft. 914 mm 12 ft.* 3.7 m 6 ft 1.8 m = 18 ft. (5.5 m) Maximum = 50 ft. (15.2 m) Maximum Figure 7.6 Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 30 15-60 feet, an exhaust restrictor may baffle and refractory panel after exhaust be needed. The exhaust restrictor can be located in the restrictor installation. appliance manual bag. Figure 7.8 Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 31 MUST subtract one number from the table above. Example: Top vent 40 ft vertical with DVP pipe = 5-4 Top vent 40 ft vertical with SLP pipe = 4-3 Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 32 18 ft. 5.5 m = 18 ft (5.5 m) Maximum *No specifi c restrictions on this value EXCEPT cannot exceed 50 ft (15.2 m) INSTALLED HORIZONTALLY Figure 7.12 Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 33: Rear Vent - Horizontal Termination

    = 16 in. (406 mm) Maximum No Elbow Figure 7.13 One 45° Elbow DO NOT use a 45º elbow in corner installations. Use two 90º elbow instead. Figure 7.14 Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 34 2.7 m 12 ft. 3.7 m INSTALLED = 40 ft (12.2 m) Maximum = 3 ft (94 mm) Maximum HORIZONTALLY = 12 ft (3.7 m) Maximum Figure 7.16 Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 35 1.5 m 10 ft. 6 ft. 1.8 m 12 ft. 3.7 m = 50 ft (15.2 m) Maximum = 16 ft (4.9 m) Maximum INSTALLED HORIZONTALLY Figure 7.18 Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 36 6 ft. 1.8 m *No specifi c restrictions on this value EXCEPT cannot exceed 50 ft. (15.2 m) Maximum = 6 ft. (1.8 m) Maximum INSTALLED Figure 7.20 HORIZONTALLY Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 37: Vent Clearances And Framing

    Figure 8.2 Wall Penetration Note: When venting off the top of the unit and terminating horizontally, using SLP pipe, a 10 in. x 10 in. framing hole is required. Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 38: Vertical Penetration Framing

    Figure 8.3 INSTALL ATTIC INSULATION SHIELDS BEFORE OR AFTER INSTALLATION OF VENT SYSTEM CEILING FIRESTOP CEILING FIRESTOP INSTALLED BELOW CEILING INSTALLED ABOVE CEILING Figure 8.4 Installing the Attic Shield Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 39: Appliance Preparation

    Secure the vent gasket to the appliance with two Remove screws to access vent. self-tapping screws found in the manual bag. Note: The vent gasket can found in the manual bag. Proceed to Section 9. C. Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 40: Rear Vent

    Secure the vent gasket to the appliance with two self-tapping screws found in the manual bag. Note: The vent gasket can found in the manual bag. Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 41: Securing And Leveling The Appliance

    90º Note: Once appliance is setup for top or rear venting, it CANNOT be changed at a later time. Figure 9.11 Proper Positioning and Leveling of an Appliance Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 42: Installing Vent Pipe (Dvp And Slp Pipe)

    fl ue at the horizontal elbow joint to prevent the elbow from rotating. Use screws no longer than 1/2 in. (13 mm). If predrilling screw holes, DO NOT penetrate inner pipe. INCORRECT Figure 10.4 Seams Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 43: Assemble Vent Sections (Slp Pipe Only)

    • Only outer pipes are sealed, sealing the inner fl ue is not Figure 10.5 Adding Venting Components required. • All unit collar, pipe, slip section, elbow and cap outer fl ues shall be sealed. Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 44: Secure The Vent Sections

    Figure 10.10 Rotate Seams for Disassembly connection point to appliance. 120º Figure 10.11 Align and Disassemble Vent Sections Figure 10.8 Securing Vertical Pipe Sections 120º Figure 10.9 Securing Horizontal Pipe Sections Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 45: Install Decorative Ceiling Components (Slp Only)

    fl aps and the roof. WARNING! Risk of Fire! Clean out ALL materials from Figure 10.13 inside the support box and complete the vertical vent run and termination. Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 46: Install Metal Roof Flashing

    • Caulk the gap between the roof fl ashing and the outside diameter of the pipe. • Caulk the perimeter of the fl ashing where it contacts the roof surface. See Figure 10.15. Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 47: Install Vertical Termination Cap

    • Once the pipe section and the termination cap have been connected, slide the wall thimble up to the interior wall surface and attach with screws provided. See Figure 10.18. Figure 10.18 Wall Thimble Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 48: Install Horizontal Termination Cap (Dvp And Slp Pipe)

    DVP-TRAP1 can adjust 1-1/2 in. (3-1/8 to 4-5/8 in.) DVP-TRAP2 can adjust 4 in. (5-3/8 to 9-3/8) DVP-HPC1 can adjust 2-1/8 in. (4-1/4 to 6-3/8) DVP-HPC2 can adjust 4-1/8 in. (6-3/8 to 10-1/2) Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 49: Gas Information

    fl exible gas connector are connected to the 1/2 inch consult local gas utility. (13 mm) control valve inlet. • If substituting for these components, please consult local codes for compliance. Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 50: Electrical Information

    Verify proper operation after servicing. WARNING! Risk of Shock! Replace damaged wire with type 105° C rated wire. Wire must have high temperature insulation. Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 51: Wsk-Mlt Multifunction Wall Switch

    Na- tional Electric Code ANSI/NFGA No. 70- current (in the United States), or with the current CSA C22.1 CANADI- AN ELECTRIC CODE (in Canada). Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 52 BLACK FAN THERMOSTAT FAN CORD EMBER LIGHT GROUND PIGTAIL CONNECTION CONNECTOR BLOCK GREEN BLACK BLACK SEE DETAIL IN FIGURE 12.3 CONNECTION Figure 12.2 Intellifi re (IPI) Wiring Diagram Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 53: Install The Flame Solenoid

    GAS CONTROL VALVE KNOB SCREW WASHER VARIABLE REGULATOR WASHER VARIABLE REGULATOR SOLENOID FLAME CONTROL VARIABLE JAM NUT PLUNGER SOLENOID REGULATOR Figure 12.4 Install the Flame Solenoid Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 54: Wsk-Mlt Operating Instructions

    Fahrenheit and Centigrade Temperature Display. Automatic Operation: Controller will monitor temperature and control unit according to the set point. Manual Operation: Controller will not automatically change settings. Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 55 This allows the pilot fl ame to stay lit when activated. A benefi t of this is reduced condensation on the glass at start-up in colder climate conditions. Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 56: Finishing

    Figure 13.2 Folding Top Flap Step 3. Crease fl aps on left and right sides of splatter guard using the scored line as the guide. See Figure 13.2. Figure 13.5 Top slot Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 57 Pull outward gently, but fi rmly, Figure 13.8 Opening Lower Access Panel taking care not to tear or remove the inserted tabs. Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 58: Mantel And Wall Projections

    Figure 13.15 Minimum Vertical and Maximum Horizontal Dimensions of Non-Combustibles MEASUREMENT FROM FIREPLACE OPENING TO BOTTOM OF APPLIANCE= 33-1/2 IN. Figure 13.13 Minimum Vertical and Maximum Horizontal Dimensions of Combustibles Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 59: Facing Material

    - Top and Sides 0 in. 0 in. 0 in. High Temperature Sealant (300° F/149° C min.) Top and Side Seal Joint Figure 13.17 Noncombustible Facing Diagram Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 60: Finishing Material

    Finishing material between 1 and 2 inches thick. Stop fi nishing material fl ush with opening. Figure 13.21 Operable Hinge Decorative Front Figure 13.19 Overlap Fit Decorative Front Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 61 FINISHING MATERIAL 33-5/8 in. 37-1/4 in. Figure 13.22 Pier Decorative front Finishing Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 62: Elevated Hearth Systems

    Note 1. Add dimensions to Exterior Wall Hole (Figure 8.2) and Rough Opening Height (Figure 5.2). Note 2. Verify Marble Cut Lengths on site prior to cutting. Note 3. Dimensions assume use of a 3/4 in. Hearth Pad. Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 63: Appliance Setup

    Figure 14.1 Teco-Sil Start by applying the glass ember rock (Teco-Sil) to the base pan as shown in Figure 14.2. Figure 14.5 Painting Teco-Sil Figure 14.2 Teco-Sil Placement Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 64 • Save the remaining ember materials for use during Figure 14.6 Painting Teco-Sil appliance servicing. The embers provided should be enough for 3 to 5 applications. Figure 14.7 Placement of Embers Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 65: Install The Log Assembly

    LOG #2 (SRV2005-700): Position log #2 on the left grate bar and the pilot assembly. Use the cut out notches on the log to position it as shown. 2005-937F 9/08 Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 66 LOG #5 (SRV2005-704): Using the sharp notch on the heavy end of log #5, align it on the grate tine and set it on the fl at area of log #4 as shown. Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 67 fl at area of log #1. The orientation of log #6 in relation to the grate tine is shown below. Notch engaged with Notch engaged with grate tine. grate tine. Log Assembly Installed. Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 68: Fixed Glass Assembly

    Fully open on the glass frame top and bottom. • Make sure all sides are replaced properly. LATCHES BOTH BOTTOM AND TOP) GLASS ASSEMBLY Figure 14.3 Fixed Glass Assembly Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 69: Troubleshooting

    Verify module is securely grounded to metal chassis of appliance. d. Module voltage output / Valve/Pilot Verify battery voltage is at least 2.7 volts. Replace batteries if volt- solenoid ohms readings. age is below 2.7. Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 70 ON position. If there is no spark at “I” terminal module must be replaced. If there is a spark at “I” terminal, module is fi ne. Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 71: Reference Materials

    GAS LINE ACCESS FRONT VIEW RIGHT VIEW LEFT VIEW Location Inches Millimeters Location Inches Millimeters 1-1/2 42-1/2 1080 24-1/2 33-1/2 9-1/2 2-1/8 4-1/8 34-5/8 4-1/4 Figure 16.1 See-Through Dimensions Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 72 GAS LINE ACCESS FRONT VIEW RIGHT VIEW LEFT VIEW Location Inches Millimeters Location Inches Millimeters 1-1/2 40-1/2 1029 24-1/2 33-1/2 9-1/2 2-1/8 34-5/8 4-1/8 4-1/4 Figure 16.2 Pier Dimensions Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 73: Vent Components Diagrams

    14 in. (356 mm) 5 in. 12 in. (127 mm) (305 mm) 6 in. (152 mm) DVP-HVS (Vent Support) DVP-WS (Wall Shield Firestop) Figure 16.3 DVP vent components Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 74 79 mm 117 mm Length 5-3/8 in. 9-3/8 in. DVP-TRAP Trap2 Horizontal Termination Cap 137 mm 238 mm DVP-TRAP2 DVP-TRAP1 DVP-TRAPK2 DVP-TRAPK1 DVP-HPC1 DVP-HPC2 Figure 16.4 DVP vent components Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 75 13-7/8 in. 9-1/2 in. 26 in. (352 mm) (241 mm) 660 mm 14 in. (356 mm) DVP-HSM-B Extended Heat Shield DRC-RADIUS Figure 16.5 DVP vent components Cap Shield Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 76 1 in. (25 mm) (222 mm) 7-3/4 to 10-3/8 in. (197 to 264 mm) 1-5/8 in. (41 mm) DVP-FBHT FireBrickTermination Cap DVP-HPC High Performance Cap Figure 16.6 DVP Vent Components Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 77 9-3/16 IN. (233 mm) 13-5/8 16-11/16 IN. 16-11/16 IN. (346 mm) 424 mm (424 mm) 12-1/2 IN. (318 mm) SLP-LPC SLP Low Profi le Cap Figure 16.7 Vent Components Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 78 8-11/16 in. 1-1/2 in. 12 in. 5-1/2 in. 220 mm 38 mm 305 mm 146 mm SLP-WS SLP-FS Wall Shield Firestop Ceiling Firestop Figure 16.8 SLP Series Vent Components Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 79 PVK-80 (For use with IPI and DSI appliances only.) DVP-FBHT DVP-FBHT 26 in. SL-2DVP 660 mm SLP90 DVP-HSM-B Extended Heat Shield ASSEMBLY Figure 16.9 SLP Series Vent Components Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 80 1 in. (25 mm) 13-1/2 in. 343 mm 7-3/4 to 10-3/8 in. (197 to 264 mm) DVP-FBHT SLK-SNKD Horizontal Snorkel Termination Cap Termination Cap Figure 16.10 SLP Series Vent Components Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 81 100 FT PV Wire Harness PVI-WH100 separately. Use if the PVLP-SLP is installed in a high traffi c area. PVLP-HS PVLP-BEK Heat Shield Brick Kit Figure 16.11 PVLP-SLP Vent Components Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 82: C. Service Parts

    2128-128 Junction Box 4021-013 Refractory (Air Passage Side) 2129-016 Surround Overlay (contains overlay for top, bottom and sides) SRV2128-FACE Additional service part numbers appear on following page. 4/15 Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 83: Service Parts

    Junction Box Bracket 2128-128 Junction Box 4021-013 Refractory 2129-016 Surround Overlay (contains overlay for top, bottom and sides) SRV2130-FACE Additional service part numbers appear on following page. 4/15 Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 84 17.14 Solenoid HTI-17-006 17.15 Controls Plate 2176-121 17.16 On/Off Rocker Switch 060-511 17.17 Control Box HTI-13-007 17.18 Battery Pack 593-594A Additional service part numbers appear on following page. Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 85 Wire Wall Switch 2095-550 NGK-MS36 Conversion Kit NG Conversion Kit LP LPK-MS36 Pilot Ori ce NG 593-528 Pilot Ori ce LP 593-527 Regulator NG NGK-DXV Regulator LP LPK-DXV Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...
  • Page 86: Contact Information

    5941237, 6006743, 6019099, 6053165, 6145502, 6374822, 6484712, 6601579, 6769426, 6863064, 7077122, 7098269, 7258116, 7470729, 8147240 or other U.S. and foreign patents pending. 2000-945C Printed in U.S.A. - Copyright 2015 Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15...

This manual is also suitable for:

St-36trlp-ipiPier-36tr-ipiPier-36trlp-ipi

Table of Contents