Installation; After The Fryers Are Anchored At The Frying Station - Frymaster MARINE E4 FPRE 17 kW Installation, Operation, Service, And Parts Manual

Table of Contents

Advertisement

This appliance must be connected to a power supply having the same voltage and
phase as specified on the rating plate located on the inside of the appliance door.
All wiring connections for this appliance must be made in accordance with the
wiring diagram(s) furnished with the appliance.
affixed to the inside of the appliance door when installing or servicing this
equipment.
2.3

Installation

Shipboard installations are often unique, however, here's a list of do's and don'ts to avoid trouble:
Do ensure the fryer is adequately attached to the deck.
Do ensure the fryer is mounted well away from appliances, which are
sprayed with water.
Do mount the remote controller within easy reach of the operator and away
from the heat and vapors of the fryer vat and other cooking equipment.
Do remove the 15-pin plug from the controller cable with a pin pusher
before routing it to the fryer and carefully reattach, using the provided
diagram in section 7.15.
Don't mount the remote controller on the fryer's flue cap or on the
bulkhead above the fryer vat.
Don't cut and splice the remote controller's cable to facilitate routing it to
the fryer.
No structural material on the fryer should be altered or
removed to accommodate placement of the fryer under a hood.
Questions? Call the Frymaster Dean Service Department at 1-
800-551-8633 or via e-mail at service@frymaster.com
Hot oil can cause severe burns. Avoid contact. Under all circumstances, oil must be
removed from the fryer before attempting to move it to avoid oil spills, falls and severe
burns. This fryer may tip and cause personal injury if not secured in a stationary position.
2.4
After Fryers Are Anchored At the Frying Station
1. Close frypot drain-valve(s) and fill frypot(s) with water to the bottom oil level line.
2. Boil out frypot(s) in accordance with the instructions in Section 5.1.3 of this manual.
3. Drain, clean, and fill frypot(s) with cooking oil.
Procedures in Chapter 3.)
DANGER
DANGER
DANGER
DANGER
2-3
Refer to the wiring diagram(s)
DO use a pin pusher
to remove the 15-pin
plug on the controller
cable for routing.
DO NOT mount the
controller on the fryer's
flue
bulkhead
fryer's vat.
(See Equipment Setup and Shutdown
cap
or
on
the
above
the

Advertisement

Table of Contents
loading

This manual is also suitable for:

Marine e4 re seriesMarine e4 fpre 22 kw

Table of Contents