Cd-Rom And Floppy Drive Installation - Supero SuperServer 5013G-6 User Manual

Economic single processor 1u rackmount server
Table of Contents

Advertisement

S
S
UPER
ERVER 5013G-6/5013G-i Manual
Figure 6-6.

CD-ROM and Floppy Drive Installation

The top cover of the chassis must be opened to gain full access to the CD-
ROM and floppy drive bays. The CD-ROM drive must have a "slim" profile to
fit into the 5013G-6/5013G-i.
First, release the retention screws that secure the unit to the rack. Grasp
the two handles on either side and pull the unit straight out until it locks (you
will hear a "click"). Next, depress the two buttons on the top of the chassis
to release the top cover and at the same time, push the cover away from
you until it stops. You can then lift the top cover from the chassis to gain
full access to the inside of the server. You must power down the system
before installing or removing floppy or IDE drives.
Drives mount on rails and should "click" into place to be correctly and fully
installed in their bays.
• The floppy disk drive cable has seven twisted wires.
• A red mark on a wire typically designates the location of pin 1.
• A single floppy disk drive ribbon cable has 34 wires and two connectors
to provide for two floppy disk drives.
always connects to drive A, and the connector that does not have
twisted wires always connects to drive B.
Removing IDE Drives (5013G-i)
The connector with twisted wires
6-8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Superserver 5013g-i

Table of Contents