Testing

After installation of the device, execute the following tests before the
wheelchair is delivered or put into service, in according order:
1
Check the Scoot Control for intactness on page 32
2
Operational test on page 32
3
Test drive on page 35
4
Stop test on page 35

Check the Scoot Control for intactness

Check whether:
1
The device is not bent or damaged.
2
Housing, cabling and all connectors are not damaged.
3
The handlebar and throttles return to their default position when
moving them respectively to the left and right and up and down.

Operational test

CAUTION:
metre of free space around the wheelchair.
32
Execute this test only on a level surface, with at least one
Scoot Control Installation manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the coot Control R-net and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Scoot control linxP015-61P015-71

Table of Contents