2 - RECEIPT OF GOODS

2.1 - Checking the equipment received

Check that the unit and the accessories have not been damaged
during transport and that no parts are missing. If the unit and the
accessories have been damaged or the shipment is incomplete,
send a claim to the shipping company.
Compare the name plate data with the order.
The name plate is attached in two places to the unit:
■ On the outside of one of the unit frames,
■ On the electrical cabinet, inside.
The unit name plate must include the following information:
■ Model number - size, address of manufacturer,
■ CE marking,
■ Serial number,
■ Year of manufacture and pressure and leak tightness test date,
■ Fluid used for transport,
■ Refrigerant used,
■ Refrigerant charge per circuit,
■ PS: Min./max. allowable pressure (high and low pressure side),
■ TS: Min./max. allowable temperature (high and low pressure
side),
■ Pressure switch cut-out pressure,
■ Unit leak test pressure,
■ Voltage, frequency, number of phases,
■ Maximum current,
■ Maximum power input,
■ Unit net weight.
12

2.2 - Handling

It is strongly recommended that a specialised company is
employed to unload the machine.
Do not remove the skid or the packaging until the unit is in its final 
position.
These units can be safely moved by trained personnel with a fork
lift truck with the correct capacity for the dimensions and weight
of the unit, as long as the forks are positioned in the location and
direction shown on the unit.
The units can also be lifted with slings, using only the designated
lifting points marked on the unit (labels on the chassis and label
with the unit handling instructions, attached to the unit).
Use slings with the correct capacity, and follow the lifting
instructions on the certified dimensional drawings supplied for the 
unit.
WARNING: Only attach slings to the designated lifting points
which are marked on the unit.
It is advisable to protect coils against crushing while a unit is being
moved. Use struts or a lifting beam to spread the slings above the
unit. Do not tilt a unit more than 15°.
Safety can only be guaranteed if these instructions are carefully
followed. Failure to do so may result in damage to the equipment
and physical injury.
See the slinging plan for each machine in section 3 and in
appendix 4.
CAUTION: Before lifting the unit, check that all casing panels
and grilles are securely fixed in place. Lift and set down the
unit with great care. Tilting and jarring can damage the unit.
WARNING: Never apply pressure or leverage to any of the
unit's panels or uprights ; only the base of the unit frame is
designed to withstand such stresses. No force or effort must
be applied to pressurized parts, especially via pipes
connected to the water-cooled heat exchanger.