Horizontal Stacking (Side Extension Box) - ABB Protecta Power IV Assembly Manuallines

Table of Contents

Advertisement

Horizontal Stacking (Side Extension Box)

1
Untighten the side gland plate
3

Hex Serrated Nut M6
2
Hex Serrated Nut M6
Flat Washer M6
Hex Head
Screw M6x16
T = 9 Nm
Make sure the Gasket on Panel Side is pressed before tightening the screws
4
Hex Serrated Nut M6
T= 9 Nm
14

Advertisement

Table of Contents
loading

Table of Contents