Advertisement

Quick Links

ASSEMBLY INSTRUCTIONS
SL1020
BASE SIZE: 1.020m x 2.020m

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SL1020 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Duratuf SL1020

  • Page 1 ASSEMBLY INSTRUCTIONS SL1020 BASE SIZE: 1.020m x 2.020m...
  • Page 2 CHECK OUT OUR ASSEMBLY VIDEO...
  • Page 3: Before You Start

    TAPE MEASURE (timber floor only) WARRANTY REQUIREMENTS: The following maintenance process needs to be adhered to, to qualify for the steel warranty of your Duratuf Sentry shed. • Wash all surfaces annually using a hose and soft nylon brush. •...
  • Page 4 SL1020 PARTS LIST CLADDING + FLASHINGS + HARDWARE PACK 1 DESCRIPTION DIAGRAM CHECKED Back Wall - 1.860m Side Wall Angle- 1.965m Side Wall Angle- 1.935m Side Wall Angle- 1.905m Side Wall Angle- 1.875m Roof - 2.200m Door Sheet Narrow - 1.940m Door Sides - 1.940m...
  • Page 5 SL1020 PARTS LIST PACK 2 TIMBER DESCRIPTION DIAGRAM Front/Back Bottom Plates - H4 (Green) 1.020 m Front/Back Top Plate - H1 (Red) 1.020 m Side Wall Bottom Plates - H4 (Green) 2.020 m Side Wall Top Plates - H1 (Red)
  • Page 6: Parts Location

    PARTS LOCATION Roof Sheets Barge Flashing Back Wall Sheets Spouting Top Plate Back Top Plate Side Top Plate Front Door Brace Door Side Flashing Door Sheets Door Jambs Side Wall Sheets Padbolt Support Bottom Plate Front Bottom Plate Side Door Top/Bottom Flashing QUICK OVERVIEW ASSEMBLE BACK ASSEMBLE SIDE...
  • Page 7 FOUNDATION No doubt by now you will have decided what sort of base you are putting down. Please read the section that applies to your situation. If you choose to pour a concrete base you will need to decide whether you wish to raise the base plate of your shed. This allows the cladding to protrude below the surface of the concrete and ensures a water tight pad.
  • Page 8 ASSEMBLE DOOR SELECT: 2 x 1.940 m Door Sheets (Narrow) 2 x 0.945 m Door Top/Bottom Flashings 2 x 1.940 m Door Side Flashings 3 x Hinges 1 x Padbolt Support Flashing 2 x 1.200 m Door Brace Flashings 59 x Rivets fig.3 STEP 1: NARROW PANS...
  • Page 9 ASSEMBLE SIDE PANELS SELECT: IMPORTANT—IF YOU CHOOSE TO RAISE YOUR TIMBER BASE PLATE –READ THE FOLLOWING; 2 x 1.875 m Side Wall Sheets (Angled) 2 x 1.905 m Side Wall Sheets (Angled) For sheds with Raised Base Plate option only (see page 6), deduct 2 x 1.935 m Side Wall Sheets (Angled) 30mm from measurement shown between Top and Bottom Plates on 2 x 1.965 m Side Wall Sheets (Angled)
  • Page 10 ASSEMBLE BACK PANEL IMPORTANT—IF YOU CHOOSE TO RAISE YOUR TIMBER SELECT: BASE PLATE –READ THE FOLLOWING; For sheds with Raised Base Plate option only (see page 6), deduct 2 x 1.890 m Wall Sheets 30mm from measurement shown between Top and Bottom Plates on 1 x 1.020 m Top Plate (Red) all wall panels, so cladding protrudes 20mm below bottom plate 1 x 1.020 m Bottom Plate (Green)
  • Page 11 ASSEMBLE FRONT PANEL IMPORTANT—IF YOU CHOOSE TO RAISE YOUR TIMBER SELECT: BASE PLATE –READ THE FOLLOWING; 1 x 1.020 Top Plate (Red) For sheds with Raised Base Plate option only (see page 6), deduct 1 x 1.020 Bottom Plate (Green) 30mm from measurement shown between Top and Bottom Plates on 2 x 1.980 Corner Door Jamb Flashing all wall panels, so cladding protrudes 20mm below bottom plate...
  • Page 12: Wall Panel Assembly

    WALL PANEL ASSEMBLY SELECT: 4 x Pre-made Wall Panels SIDE 16 x 40mm Screws OVERLAPS BACK 16 x Rivets TOP PLATE STEP 1: BACK WALL • Stand the Back Panel and the Side Panel BOTTOM PLATE up using someone to support the panels while they are screwed together.
  • Page 13: Roof Assembly

    ROOF ASSEMBLY IMPORTANT SELECT: Use 50mm Clouts only on outside ribs covered by Barge flashings. Predrill holes using a 3.5mm drill bit. Use Roofing Screws on all other ribs. Ensure 2 x 2.200 m Roof Sheets screws are not overtightened as this can damage the seals and cause the shed 1 x 1.055 m Spouting 2 x 2.200 m Barges to leak.
  • Page 14 Secure your shed using Treated Timber Pegs or a Bolt Down Kit TIMBER PEGS—WOODEN FLOOR • The optional Duratuf Timber Peg Down Kit includes six H5 treated timber pegs that can be hammered into the ground and then attached to the Base Plate with stainless steel screws.
  • Page 16: Year Warranty

    20 YEAR WARRANTY Riverlea Group Ltd warrant that the cladding used in the manufacture of the Sentry shed will not rust within 20 years from the date of purchase. Any liability for product failure that may arise will be limited to repair or replacement of the defective product and will only apply for the benefit of the original purchaser.

Table of Contents