• Mark and drill where indicated (holes size depends on the selected wall anchors and support materials).
• Put the dowels in the holes.
• Screw the top screws into the dowels (M6 recommended), let them protrude by about 0.39 in / 10 mm.
• Hang the device to the top screws and align it vertically and horizontally ensure device is level.
• Tighten up all screws.
Designs, materials, weights and performance ratings are approximate and subject to change without notice. Visit armstronginternational.com for up-to-date information.
Fig. 2-1: Installation holes
ERS-LC
[mm] / [in]
A:
450 / 17.71
A1:
A2:
B:
510 / 20.08
B1:
C
Armstrong International
North America • Latin America • India • Europe / Middle East / Africa • China • Pacific Rim