Unpacking and Inspection
Before opening DXP H1010 processor shipping box, inspect it for damage. If you find any damage, notify the
shipping carrier immediately for all claims adjustments. As you open the box, compare its contents against the
packing slip. If you find any shortages, contact your sales representative.
Once you have removed all the components from their packaging and checked that all the listed components
are present, visually inspect the system to ensure there was no damage during shipping. If there is damage,
notify the shipping carrier immediately for all claims adjustments.
Site Preparation
The environment in which you install your DXP H1010 should be clean, properly lit, free from static, and have
adequate power, ventilation, and space for all components.
DXP H1010
User Manual
5
Need help?
Do you have a question about the DXP H1010 and is the answer not in the manual?
Questions and answers