Mitsubishi Electric PUMY-P36NKMU4 Technical & Service Manual page 159

Hide thumbs Also See for PUMY-P36NKMU4:
Table of Contents

Advertisement

OPERATING PROCEDURE
14. Removing the accumulator
(1) Remove the service panel. (See Photo 1)
(2) Remove the top panel. (See Photo 1)
(3) Remove the electrical parts box. (See Photo 5)
(4) Remove the valve bed. (See procedure 8 (4))
(5) Remove the cover panel (front). (Refer to procedure 8(5))
(6) Remove the cover panel (rear) (Refer to procedure 8(6))
(7) Remove the side panel (R). (Refer to procedure 8 (7))
(8) Recover refrigerant.
(9) Remove 2 welded pipes of accumulator inlet and outlet.
(10) Remove 2 accumulator leg fixing screws (4 × 10). (See
Photo 16)
Note: Recover refrigerant without spreading it in the air.
15. Removing the reactor (DCL)
(1) Remove the service panel. (See Photo 1)
(2) Remove the top panel. (See Photo 1)
(3) Remove the electrical parts box (See photo 5)
(4) Remove 6 screws (4 x 10) for reactors to remove the
reactors. (See Figure 3)
OCH811A
PHOTOS/FIGURES
Photo 15
Outlet
Fusible plug
Photo 16
Compressor
(MC)
Separator
Separator
fixing screw
Figure 3
Screws for
reactors
159
Accumulator
Accumulator
leg fixing
Compressor
screws
fixing nuts
Reactors
Inlet
Accumulator
Accumulator
leg

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents