ABB Fimer PVI-10.0/12.5-TL-OUTD Product Manual page 67

Table of Contents

Advertisement

• During the grid voltage check and measurement of the insulation re-
sistance, the values for the grid voltage and frequency and the insula-
tion resistance measured by the inverter are shown on the display. The
inverter completes parallel connection with the grid SOLELY if the grid
parameters meet the ranges provided for by the regulations in force and
if the insulation resistance is greater than 1Mohm.
• If the preliminary checks for parallel connection to the grid are suc-
cessful, the inverter connects to the grid and begins to export power to
the grid. At this stage, the display shows the inverter's parameters in
cycles. The green LED stays lit whereas the others are off.
The "Country" value (grid standard) that can be selected are listed in the
following table:
Displayed name
SINGAPORE
THAIL. PEA
VDE0126 3W
THAIL. MEA
FRANCE 14
EN50438
TURKEY HV
SLOVENIA
ROMANIA
TURKEY LV
C1011 110
C1011 100
S. AFRICA
CEI 021 EX.
VDE 4105
The list of grid standards given in the table was valid at the time of issue of the manual. It will
be continually updated as new country standards with which the inverter is compatible are
introduced
Display language
English
English
English
English
French
English
CEI 016
Italian
English
English
English
English
BRAZIL
English
French
French
RD 1565
Spanish
English
Italian
German
7 - Operation
Displayed name
Display language
CZECH
Cestina
TAIWAN
English
KOREA
English
HUNGARY
English
CORSICA
French
PORTUGAL
English
GREECE
English
NETHERL.
Dutch
FRANCE 13
French
BDEW
German
ISRAEL
English
AS 4777
English
IRELAND
English
UK G59
English
UK G83
English
RD 1699
Spanish
ENEL
English
VDE 0126
English
67

Advertisement

Table of Contents
loading

Table of Contents