ABB Fimer PVI-10.0/12.5-TL-OUTD Product Manual page 97

Table of Contents

Advertisement

8 - Maintenance
Stage 3 - Request for second level password
- Go online and access https://registration.solar.fimer.com
- Insert the Username (corresponding to the email used during registra-
tion) and the Password obtained at the end of Stage 2
- Access the section dedicated to requesting the second-level password
- Choose the inverter model from the drop-down list and insert Update
Ver., Serial Number and Week of Production of the inverter which were
obtained previously (Stage 1)
97

Advertisement

Table of Contents
loading

Table of Contents